Difference between revisions of "Regular meeting 9.1.2012"

From Developer Documents
Jump to navigation Jump to search
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
[[Category:Meetings]]
 +
{{nav|prev=Platform development process|up=Platform development process|next=Extra meeting 10.1.2012}}
 
== Agenda ==
 
== Agenda ==
  
Line 20: Line 22:
  
 
== Minutes ==
 
== Minutes ==
 +
 +
Paikalla: Tommi, Antti, Tuukka, Kalle, Harri, Hannu saapui loppukokoukseen.
  
 
1. Work practices for spring 2012
 
1. Work practices for spring 2012
  
* Regular meetings on Mondays every two weeks at 10.30 - 12.00 AM.
+
Regular meetings on Mondays every two weeks at 10.30 - 12.00 AM.
* Agenda delivered on previous Friday before 12 AM.
+
Agenda delivered on previous Friday before 12 AM.
* Minutes released at simantics.org
+
Minutes released at simantics.org
* Schedule extra meetings until most important issues have been addressed
+
Schedule extra meetings until most important issues have been addressed
  
 
2. Survey of development areas
 
2. Survey of development areas
Line 79: Line 83:
 
** Migration support?
 
** Migration support?
  
 +
Ei käsitelty.
  
 
3. Release 1.8 content planning
 
3. Release 1.8 content planning
  
* SCL
+
Ei käsitelty.
* ??
 
  
 
4. Version control improvements after 1.6
 
4. Version control improvements after 1.6
  
* Stable branch?
+
:§ Kaikki commitit platformiin pitää kohdistaa yhdelle tai useammalle stoorille.
* Changelogs?
+
 
 +
:§ Tehdään uusi branch 'stable'. Stableen mergetetään trunk sprintin alussa olevan rauhoitusajan päätteeksi, mikäli todetaan, että trunk on riittävän hyvä.
 +
 
 +
Siirtymästä flattiin rakenteeseen SVN:ssä keskusteltiin. Vanhan historian käyttö hankaloittuu. Buildeja pitää uudelleenkonfiguroida, vaikkakin korjaustyö on varsin pieni. Kehittäjien kannalta ei iso ongelma, mikäli tiedotus pelaa. Buildien konfigurointi helpottuu. Yhteiskäyttö GIT:n kanssa helpottuu. Branchien käyttö helpottuu.
  
 
5. Other issues
 
5. Other issues
 +
 +
Seuraava kokous 10.1.2012 kello 9.30.

Latest revision as of 21:35, 10 January 2012

Previous Up Next

Agenda

1. Work practices for spring 2012

Decide work practices for Simantics platform meetings and development.

2. Survey of development areas

Create a list of most important epic stories in Simantics development.

3. Release 1.8 content planning

Start the discussion about the contents of 1.8

4. Version control improvements after 1.6

Decide how to improve SVN practices to better accommodate work of Simantics developers.

5. Other issues

Minutes

Paikalla: Tommi, Antti, Tuukka, Kalle, Harri, Hannu saapui loppukokoukseen.

1. Work practices for spring 2012

§ Regular meetings on Mondays every two weeks at 10.30 - 12.00 AM.
§ Agenda delivered on previous Friday before 12 AM.
§ Minutes released at simantics.org
§ Schedule extra meetings until most important issues have been addressed

2. Survey of development areas

  • Scrum and SVN process
  • Layer0
    • Inverses
    • ConsistsOf
    • Export/import
  • SCL
    • Function library design and development rules
    • Contexts in getRelatedValue2
    • Technical details on using ReadGraph and indices
  • DB client
    • Interface cleanup and improvements
    • Implementation improvements
  • Variable
    • Inteface improvements
    • Standard property specification
    • Standard implementation of graph-based variables
    • Standard implementation of simulator variables?
  • Modelled Selection view
    • Model improvement
  • Experiment control
    • Interfaces
    • Interplay with Variable
  • Structural
    • Interface variables
    • Standard implementation?
  • Scenegraph
    • Loaders
    • Refactoring needs
    • Diagram
    • 3D
    • Documents
    • Views
  • Diagram
    • Refactoring towards Scenegraph
    • Layers
    • Testing
  • Mapping framework
    • SCL-based definition
  • Testing
    • Increasing automatic testing
    • Squish
  • Team features
    • Implementation strategy
  • Migration
    • Tool development
  • IDE integration
    • SCL support
    • Migration support?

Ei käsitelty.

3. Release 1.8 content planning

Ei käsitelty.

4. Version control improvements after 1.6

§ Kaikki commitit platformiin pitää kohdistaa yhdelle tai useammalle stoorille.
§ Tehdään uusi branch 'stable'. Stableen mergetetään trunk sprintin alussa olevan rauhoitusajan päätteeksi, mikäli todetaan, että trunk on riittävän hyvä.

Siirtymästä flattiin rakenteeseen SVN:ssä keskusteltiin. Vanhan historian käyttö hankaloittuu. Buildeja pitää uudelleenkonfiguroida, vaikkakin korjaustyö on varsin pieni. Kehittäjien kannalta ei iso ongelma, mikäli tiedotus pelaa. Buildien konfigurointi helpottuu. Yhteiskäyttö GIT:n kanssa helpottuu. Branchien käyttö helpottuu.

5. Other issues

Seuraava kokous 10.1.2012 kello 9.30.